Changes between Version 46 and Version 47 of faq
- Timestamp:
- 04/29/2022 04:45:58 PM (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
faq
v46 v47 32 32 cat /sys/kernel/debug/clk/clk_summary 33 33 }}} 34 35 [=#ul] 36 === UL === 37 38 UL (Underwriters Laboratories) conducts electrical safety testing. 39 40 Gateworks SBCs are not pre UL certified. This is due to UL certification requiring a much larger scope of equipment, including power supply, voltages used, etc. Many Gateworks customers have gone through UL testing and passed. Gateworks boards have been designed to pass UL testing. Gateworks is more than happy to provide information to the UL representative during testing if needed. 34 41 35 42 [=#reach]