Changes between Version 8 and Version 9 of fcc


Ignore:
Timestamp:
12/28/2018 04:37:58 PM (6 years ago)
Author:
Ryan Erbstoesser
Comment:

add info about conducted emissions

Legend:

Unmodified
Added
Removed
Modified
  • fcc

    v8 v9  
    11= Gateworks FCC/CE Certification =
    2 
     2[[PageOutline]]
    33FCC & CE testing must be done on the '''complete system''' which includes enclosure, cables, radios, antenna, power supply, etc. Because of this, we do not provide FCC/CE certifications on individual boards. Gateworks can however work with your certification house on getting your complete system through certification.
    44
     
    328328[[Image(gw5400emienclosure.png​)]]
    329329
     330= Conducted Emissions =
     331
     332Conducted emissions are those that are on a conductor, such as a power or ethernet cable . In the case of using an AC to DC converted connected to a wall, the converter will provide protection.
     333
     334Common solutions include:
     335 * Install a ferrite around the power cable
     336  * This typically has not been sufficient enough, but each case will vary
     337 * Put a Pi filter inline with the power cable, such example is below:
     338  * [[Image(pifilter.png)]]
     339