| | 24 | === Revision C |
| | 25 | Date: 2022-03-08 |
| | 26 | * Replace all Active PoE/test connector diodes with available parts, due to supply chain challenges |
| | 27 | * Update TVS diode to bidirectional and move on connector side of reverse protection diode. |
| | 28 | * Add additional footprint for LIS2MDL magnetometer as optional load. |
| | 29 | * Do not load magnetic capacitors per the RGMII Phy datasheet. |
| | 30 | * Replace surface mount RJ45 with through hole part to increase connector durability. This results in some location changes of diodes and capacitors on the bottom side of the PCB. |